{"id":45725,"date":"2024-07-25T13:20:01","date_gmt":"2024-07-25T13:20:01","guid":{"rendered":"https:\/\/saperemarketing.com\/clearpath\/?p=45725"},"modified":"2024-08-02T15:04:15","modified_gmt":"2024-08-02T15:04:15","slug":"let-america-build-a-policy-path-to-modernize-energy-permitting","status":"publish","type":"post","link":"https:\/\/saperemarketing.com\/clearpath\/our-take\/let-america-build-a-policy-path-to-modernize-energy-permitting\/","title":{"rendered":"Let America build &#8211; A policy path to modernize energy permitting"},"content":{"rendered":"\n<p>Our team spends a lot of time on <strong>reliable, affordable, clean<\/strong> energy systems that run <strong>24\/7<\/strong>. These types of technologies are an integral part of our energy future, but with a growing economy and electricity demand doubling, <strong>we need MORE power.<\/strong><\/p>\n\n\n\n<p>This means building a lot of new nuclear, geothermal, and clean fossil power plants. We\u2019ll also need immense new transmission and pipeline infrastructure to move energy around the country.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-rich is-provider-embed-handler wp-block-embed-embed-handler wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"Let America build - A policy path to modernize energy permitting\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/eLZpUWowDXU?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<p>But we\u2019ve got a ton of work to do in very little time.&nbsp;<\/p>\n\n\n\n<p>Whether you are motivated by deep emissions reductions, furthering our nation\u2019s energy security, or enabling the next generation of American manufacturing, the coming decades are essential. By many estimates, that means at least <strong><em>10,000 <\/em><\/strong>new clean energy projects this decade alone. And, every one of those projects will require new permits to build.&nbsp;<\/p>\n\n\n\n<p>Unfortunately, the U.S. has a <strong><em>world-class<\/em><\/strong><strong> apparatus<\/strong>\u2026 for getting in the way.<\/p>\n\n\n\n<p>Let me give you an example. The National Environmental Policy Act, or NEPA, calls for developers to measure the environmental impact of their projects. But NEPA was passed years before we had other laws with strict environmental standards like the Clean Air Act, Clean Water Act, or Endangered Species Act.&nbsp;<\/p>\n\n\n\n<p>Each of those are important \u2014 but all together \u2026 permit reviews can spiral into extremely long efforts, spanning <em>thousands of pages<\/em> with duplicative analyses and <em>dozens of bureaucrats<\/em> required to sign off on each individual project. And, this is not even taking into account the time it takes for any local permitting or state regulations. While this system may have made sense 50 years ago, the surge in new energy demand requires a new way.&nbsp;&nbsp;&nbsp;&nbsp;<\/p>\n\n\n\n<p>When we think about how to build tens of thousands of new clean energy projects, and how to balance speed and safety, it&#8217;s obvious the U.S. needs a more predictable process.&nbsp;<\/p>\n\n\n\n<p>At ClearPath, we always focus on solutions. Here are two that should be pretty simple:&nbsp;<\/p>\n\n\n\n<p>First, grant immediate approval to projects on a site that have already undergone an environmental review.<\/p>\n\n\n\n<p>Second, we must expedite court challenges so a final decision on projects is made in a timely manner.&nbsp;<\/p>\n\n\n\n<p>Let me simplify both concepts.<br><br>Do you remember standing in line at the airport before TSA pre-check? That was brutal! Now, individuals who have proven they are not a risk can move through an expedited line.<br><br>Here\u2019s another example.<\/p>\n\n\n\n<p>There are <em>mountains<\/em> of evidence that some projects have little to no environmental impacts, such as an advanced manufacturing facility that produces parts for clean energy on a brownfield, or converting a retired coal plant to an advanced nuclear facility or siting a new geothermal plant at a depleted oil and gas well. These are the types of projects we should <strong>automatically permit <\/strong>to move forward.<\/p>\n\n\n\n<p>Just like random screenings at TSA, we can audit the operators to ensure they\u2019re complying with all environmental laws as we go. So new energy accelerates at no new environmental costs.<br><br>And for those projects that do need permits up front, we should ensure reviews are complete within 1 year and resolve any legal disputes within 6 months.<\/p>\n\n\n\n<p>Under the current system, clean energy projects can suffer long delays, sometimes decades, largely because of obstructive litigation practices. We must strike the right balance while halting the never-ending cycle of frivolous lawsuits.&nbsp;<\/p>\n\n\n\n<p>At ClearPath, we believe all of this can be done <strong><em>without<\/em><\/strong> rolling back environmental protections or eliminating the public\u2019s opportunity to be involved in the review process.&nbsp;Even with these necessary changes, a project would still be required to comply with environmental laws during its entire lifetime.*<\/p>\n\n\n\n<p>It\u2019s a win-win. Let\u2019s get building.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Our team spends a lot of time on reliable, affordable, clean energy systems that run 24\/7. These types of technologies are an integral part of our energy future, but with a growing economy and electricity demand doubling, we need MORE power. This means building a lot of new nuclear, geothermal, and clean fossil power plants. [&hellip;]<\/p>\n","protected":false},"author":296,"featured_media":45724,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ngg_post_thumbnail":0,"wds_primary_category":19,"footnotes":""},"categories":[19],"tags":[15,25,17,28,18,36,33],"class_list":["post-45725","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-our-take","tag-carbon-capture","tag-geothermal","tag-innovation","tag-natural-gas","tag-nuclear","tag-permitting","tag-video"],"acf":[],"_links":{"self":[{"href":"https:\/\/saperemarketing.com\/clearpath\/wp-json\/wp\/v2\/posts\/45725","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/saperemarketing.com\/clearpath\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/saperemarketing.com\/clearpath\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/saperemarketing.com\/clearpath\/wp-json\/wp\/v2\/users\/296"}],"replies":[{"embeddable":true,"href":"https:\/\/saperemarketing.com\/clearpath\/wp-json\/wp\/v2\/comments?post=45725"}],"version-history":[{"count":0,"href":"https:\/\/saperemarketing.com\/clearpath\/wp-json\/wp\/v2\/posts\/45725\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/saperemarketing.com\/clearpath\/wp-json\/wp\/v2\/media\/45724"}],"wp:attachment":[{"href":"https:\/\/saperemarketing.com\/clearpath\/wp-json\/wp\/v2\/media?parent=45725"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/saperemarketing.com\/clearpath\/wp-json\/wp\/v2\/categories?post=45725"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/saperemarketing.com\/clearpath\/wp-json\/wp\/v2\/tags?post=45725"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}